Forthcoming Disruption on Public Transport | |||
Tubes and trains affected by engineering works
Saturday 9 and Sunday 10 September Saturday 9 and Sunday 10 September Saturday 9 and Sunday 10 September Saturday 9 and Sunday 10 September Saturday 9 September Some platforms and lines will be closed at London Waterloo all day Saturday for work on the Waterloo and South West Upgrade project to facilitate 10 car suburban trains in December 2017. Trains towards London Waterloo will not call at Earlsfield. Passengers will need to use other services and change at Wimbledon or Clapham Junction as necessary. Most train services will run in and out of Waterloo using the lines and platforms which remain open, but may be re-timed in the London Waterloo area. Sunday 10 September Queenstown Road station will have no service and passengers should use other stations nearby.
Saturday 16 and Sunday 17 September No service between Edgware Road and Hammersmith. Saturday 16 and Sunday 17 September No service between Edgware Road and Hammersmith.
Before 0900 and after 2100 each day, no service between Earl's Court and Kensington (Olympia)
No planned engineering works No planned engineering works
The information above is specific to West and South West London. There may be disruption elsewhere on local transport networks. September 6, 2017
|